Glossary
List of terms and a few acronyms that might have crept in to the methodology
Scenario
Changing the fundamentals model to have more (or less) solar / wind / nuclear will result in a different 'scenario.'
Site configuration
The site set up - 100MW, 150MWh, in Bognor Regis, with a HV connection at 33kV, and asymmetric import/export limit of 80MW import / 100MW export.
Site-specific forecast
The numbers that are necessary for getting an investment case approved on a particular site. Eg, 1.2h, doing 2.5 cycles a day, according to a warranty which allows for up to 3 cycles per day, with a specific degradation curve, behind the EC5 boundary in the Eastern distribution network, connected at the transmission level, starting on Jan 1st 2026.
FES
Future Energy Scenarios. We look specifically at the Consumer Transformation Scenario, and use inputs from the 2023 release of the FES.
Renewable load factors
This describes the percentage of how much was generated compared to maximum possible generation.
Updated 6 months ago